# Display Totals

Display overall totals in the xViz Gantt Chart.

![GIF 1: Display overall totals in xViz Gantt Chart](/files/5iYouHdawRu5Ab8F8yvY)

To show the overall total display in the Gantt chart go to the format pane and then select chart options-> Display totals (toggle on).

![Image 1: Data field to configure Display Totals](/files/xn70ERYgOYSpiz1cjmN2)

![Image 2: Overall Result in xViz Gantt Chart](/files/oFL3FRvlygjXDYawGXmv)

We have the flexibility to modify the total display text as per our needs.

<figure><img src="/files/NgVLeIx96UgKLKcPPM2s" alt=""><figcaption><p><em>Image 3: Data field to configure Totals Text</em></p></figcaption></figure>

**Steps to be configure:**

To show numeric information on the Gantt, go to format pane and then click display categories.

1. Select the Duration type you need to display on the visualization as shown below:

![Image 4: Data Fields to configure Duration Type](/files/PZ3WJzaMrEK4MWqjSLR2)

![Image 5: Resultant view of the Duration Type in xViz Gantt](/files/QHxojMkNdO6pRGO7MUbi)

2. Go to the chart options from the format pane and then turn on Display totals option.

<figure><img src="/files/mjaGTJPgyWylAxsCggJv" alt=""><figcaption><p><em>Image 6: Turn on Display Totals</em></p></figcaption></figure>

And the overall result is displayed on the Gantt chart as shown below.

![Image 7: Resultant view of the overall result in xViz Gantt Chart](/files/6wHlKJFThZvYlXdEfl3d)

***

Try the [xViz Gantt Chart](https://xviz.com/visuals/gantt-chart/) (Microsoft certified) for Power BI from Microsoft AppSource [here](https://appsource.microsoft.com/en-sg/product/power-bi-visuals/WA200000891?tab=Overview).