xViz
ProductPricingCommunity
  • Welcome to xViz Docs!
  • Project Management
    • Project Management - xViz Gantt Chart | Introduction
    • Hierarchy and Additional Columns
    • 🔸Milestones
      • Milestone Formatting
    • Planned Bars
      • Planned Bars Formatting
    • Connectors
      • Primary & Secondary Connectors
      • Multiple Connectors
      • Connectors Formatting
    • Progress
      • Tracking the progress
      • Progress Bar Display
      • Progress Base
      • Bar Formatting
    • Timeline Configurations
      • Timeline Start/End
      • Timeline Range
      • Header Levels
      • Zoom Levels
      • Zoom Options
      • Fiscal Year Support
      • Timeline Format
      • Language Support for Timeline
    • ✨Alerting Techniques
      • Steps to enable Conditional Formatting
      • Conditional Formatting
    • Reference Lines and Reference Range
      • Introduction
      • Static Approach
      • Data Driven Approach
    • Resource Gantt
    • ➡️Other Features
      • Data Colors
        • Row Background Color
        • Bar Border Color
        • Bar Selection Color
        • Bar Fill Color
        • Connectors
      • Duration Data field
      • Display Duration
      • Display Totals
      • Hide Blanks
      • Date Formats
      • DaysOff
        • Weekday
        • Custom Date
      • Setting Up Drill-through
      • Configure External URLs
      • Splitter Position
      • Text Customization
      • Row Numbering
      • Indentation
      • Sorting
    • Parent Level Calculations
      • Aggregation Types
    • Tooltip
    • Release Notes
    • ❓FAQs
  • Performance Management
    • Performance Flow - Introduction
      • Installing from AppSource
      • Get Started
    • Use Cases
      • Organization Performance
      • Microsoft Tenant Data Analytics
        • Organization Chart using Microsoft Graph API
      • Process Flow
      • Sales Performance Analysis
      • Cost Center Analysis
      • KPI Tree
      • Warehouse Management
      • Supply Chain Network
    • Configuring the chart structure
      • Hierarchy structure
      • Grouping / Swim Lanes
        • Data Structure for Columnar Group View
        • Data Structure for Wide Group Views
      • Invisible Group
    • 🪪Display Data in the Cards
      • Title, Subtitle
      • 👨‍💼Images
        • Converting HTTPs link images/icons to Base 64 in Power BI
        • Handling long Base 64 URLs in Power BI
      • 🔢Displaying KPIs
        • Number Formatting
      • 🔻Displaying Variance
      • Sparkline Trends
      • 🔗Hyperlinks
    • Card Formatting
      • Data-Driven Color
      • Templates
      • Customize Template
        • Insert additional data
        • Alignment
        • Wrap Text
        • Styling
        • Margin & Split
        • Modify (Delete / Cope-Paste)
        • Import/Export
    • Links
    • 🗒️Notes & Annotation
    • 🚦Conditional Formatting
    • Layout & Orientation
    • ✨Search
    • ✨Viewing Subtrees
      • Cross Filtering with Subtrees
    • 🔐✨User Context - RLS Experience
    • ✨Filter Context
    • 🎨Formatting Features
      • Formatting Font & Colors
      • Connectors
      • Expand Collapse Button
      • Dimensions
    • Toolbar Ribbon Configuration
    • Simulation
    • ❓FAQs
      • Circular Dependency message
    • Tips & Tricks
      • Bookmark
      • Report Page Tooltip
      • Field Parameters
      • Drill Through
    • Release Notes
Powered by GitBook
On this page
  • Enable the Simulation Feature
  • Simulation through Node menu
  • Simulation Section in the Toolbar

Was this helpful?

  1. Performance Management

Simulation

PreviousToolbar Ribbon ConfigurationNextFAQs

Last updated 2 months ago

Was this helpful?

Simulation allows users to add, delete, and edit nodes within a chart. This functionality is available even in read view.

Please note that:

  • Since the visual is Microsoft Certified, there is no writeback capability applicable.

  • The simulations done in read view will be available only for that particular session and will be lost upon reload. The simulations done in edit view of the report will be saved in the visual tile; if the tile is deleted, the simulation will be deleted.

  • However, the simulated data can be exported as shown in Simulation Section in the Toolbar

Enable the Simulation Feature

  1. Access the Display Section:

    • Navigate to the Display section.

    • Locate the Navigation settings.

  2. Enable the Simulation Toggle:

    • In the Navigation settings, you will find the Simulation Toggle.

    • Turn on the toggle to activate the simulation feature.

  3. Toolbar and Node Menu Updates:

    • Once enabled, the Simulation section appears in the toolbar.

    • Additionally, the Formatting option becomes available in the Node Menu.

Simulation through Node menu

  1. Adding a New Node:

    • In the Node Menu click on the Add New Node to add a new node.

  2. Editing Nodes:

    • You can edit both newly created nodes and pre-existing nodes.

    • Editable Fields: Only the Title and Subtitle of a node can be modified.

  3. Deleting Nodes:

    • Users can delete both newly created nodes and existing nodes.

Simulation Section in the Toolbar

Once the simulation is enabled, a Simulation section appears in the toolbar with the following options:

  1. Excel Export:

    • Exports all modifications made to the chart into an Excel file which can be imported into a data source for further processing

  2. Revert Changes:

    • Restores the chart to its original state by undoing all modifications.

The users and readers can effectively utilize the Simulation feature to modify and manage nodes within their chart