xViz
ProductPricingCommunity
  • Welcome to xViz Docs!
  • Project Management
    • Project Management - xViz Gantt Chart | Introduction
    • Hierarchy and Additional Columns
    • 🔸Milestones
      • Milestone Formatting
    • Planned Bars
      • Planned Bars Formatting
    • Connectors
      • Primary & Secondary Connectors
      • Multiple Connectors
      • Connectors Formatting
    • Progress
      • Tracking the progress
      • Progress Bar Display
      • Progress Base
      • Bar Formatting
    • Timeline Configurations
      • Timeline Start/End
      • Timeline Range
      • Header Levels
      • Zoom Levels
      • Zoom Options
      • Fiscal Year Support
      • Timeline Format
      • Language Support for Timeline
    • ✨Alerting Techniques
      • Steps to enable Conditional Formatting
      • Conditional Formatting
    • Reference Lines and Reference Range
      • Introduction
      • Static Approach
      • Data Driven Approach
    • Resource Gantt
    • ➡️Other Features
      • Data Colors
        • Row Background Color
        • Bar Border Color
        • Bar Selection Color
        • Bar Fill Color
        • Connectors
      • Duration Data field
      • Display Duration
      • Display Totals
      • Hide Blanks
      • Date Formats
      • DaysOff
        • Weekday
        • Custom Date
      • Setting Up Drill-through
      • Configure External URLs
      • Splitter Position
      • Text Customization
      • Row Numbering
      • Indentation
      • Sorting
    • Parent Level Calculations
      • Aggregation Types
    • Tooltip
    • Release Notes
    • ❓FAQs
  • Performance Management
    • Performance Flow - Introduction
      • Installing from AppSource
      • Get Started
    • Use Cases
      • Organization Performance
      • Microsoft Tenant Data Analytics
        • Organization Chart using Microsoft Graph API
      • Process Flow
      • Sales Performance Analysis
      • Cost Center Analysis
      • KPI Tree
      • Warehouse Management
      • Supply Chain Network
    • Configuring the chart structure
      • Hierarchy structure
      • Grouping / Swim Lanes
        • Data Structure for Columnar Group View
        • Data Structure for Wide Group Views
      • Invisible Group
    • 🪪Display Data in the Cards
      • Title, Subtitle
      • 👨‍💼Images
        • Converting HTTPs link images/icons to Base 64 in Power BI
        • Handling long Base 64 URLs in Power BI
      • 🔢Displaying KPIs
        • Number Formatting
      • 🔻Displaying Variance
      • Sparkline Trends
      • 🔗Hyperlinks
    • Card Formatting
      • Data-Driven Color
      • Templates
      • Customize Template
        • Insert additional data
        • Alignment
        • Wrap Text
        • Styling
        • Margin & Split
        • Modify (Delete / Cope-Paste)
        • Import/Export
    • Links
    • 🗒️Notes & Annotation
    • 🚦Conditional Formatting
    • Layout & Orientation
    • ✨Search
    • ✨Viewing Subtrees
      • Cross Filtering with Subtrees
    • 🔐✨User Context - RLS Experience
    • ✨Filter Context
    • 🎨Formatting Features
      • Formatting Font & Colors
      • Connectors
      • Expand Collapse Button
      • Dimensions
    • Toolbar Ribbon Configuration
    • Simulation
    • ❓FAQs
      • Circular Dependency message
    • Tips & Tricks
      • Bookmark
      • Report Page Tooltip
      • Field Parameters
      • Drill Through
    • Release Notes
Powered by GitBook
On this page

Was this helpful?

  1. Performance Management
  2. Use Cases

Supply Chain Network

PreviousWarehouse ManagementNextConfiguring the chart structure

Last updated 3 months ago

Was this helpful?

Managing a supply chain involves multiple interconnected phases—Supplier, Transport, Assembly, Warehouse, Distribution, and Market. xViz Performance Flow simplifies this complexity by providing valuable insights for data-driven decision-making. With its interactive, structured view, businesses can identify bottlenecks, optimize logistics, and enhance overall supply chain efficiency.

Steps to Configure the Supply Chain Netwerk in the Performance Flow Visual:

  1. To create a supply chain network, certain columns are essential, including Link Destination, Link Direction, Link Type, Color, Border Color, and Link Width, along with Id, Parent Id, Title, and Subtitle in the dataset, as shown in the image below.

For more information on the data structure and link details, please refer to the documentation below:

  1. Populate the relevant columns in the data fields.

  1. Navigate to the Map Field option in the top ribbon and map these newly populated columns to the Map Field, as shown in the image below:

  1. Conceal the parent-child connectors to focus on the Links:

    1. To improve the appearance of the Supply Chain Network, first navigate to the Display option in the top ribbon. Then, in the Navigation tab, turn off the expand/collapse button.

    2. Navigate to the Connectors Tab and set the connector color to transparent to hide the connectors to achieving cleaner view.

  2. Now, all the Supply Chain Phases will be connected to each other based on their Link IDs.

  1. To view the network between of any Supply Chain Phase, simply click on ellipsis icon in the top-right corner of the node and select the "Show Linked" option, as shown in the image below:

As a result, it will display the network between the selected Supply Chain Phase with other Phases, as shown below:

Links
Data Structure
GIF 1: Supply Chain Network
Image 1: Dataset
Image 2: Populate Data Columns
Image 3: Map newly added column in the Map field
Image 4: Expand Collapse button
Image 5: Hide connectors
Image 6: Supply Chain Network with Links
Image 7: Show Linked
GIF 2: Supply Chain Network