xViz
ProductPricingCommunity
  • Welcome to xViz Docs!
  • Project Management
    • Project Management - xViz Gantt Chart | Introduction
    • Hierarchy and Additional Columns
    • 🔸Milestones
      • Milestone Formatting
    • Planned Bars
      • Planned Bars Formatting
    • Connectors
      • Primary & Secondary Connectors
      • Multiple Connectors
      • Connectors Formatting
    • Progress
      • Tracking the progress
      • Progress Bar Display
      • Progress Base
      • Bar Formatting
    • Timeline Configurations
      • Timeline Start/End
      • Timeline Range
      • Header Levels
      • Zoom Levels
      • Zoom Options
      • Fiscal Year Support
      • Timeline Format
      • Language Support for Timeline
    • ✨Alerting Techniques
      • Steps to enable Conditional Formatting
      • Conditional Formatting
    • Reference Lines and Reference Range
      • Introduction
      • Static Approach
      • Data Driven Approach
    • Resource Gantt
    • ➡️Other Features
      • Data Colors
        • Row Background Color
        • Bar Border Color
        • Bar Selection Color
        • Bar Fill Color
        • Connectors
      • Duration Data field
      • Display Duration
      • Display Totals
      • Hide Blanks
      • Date Formats
      • DaysOff
        • Weekday
        • Custom Date
      • Setting Up Drill-through
      • Configure External URLs
      • Splitter Position
      • Text Customization
      • Row Numbering
      • Indentation
      • Sorting
    • Parent Level Calculations
      • Aggregation Types
    • Tooltip
    • Release Notes
    • ❓FAQs
  • Performance Management
    • Performance Flow - Introduction
      • Installing from AppSource
      • Get Started
    • Use Cases
      • Organization Performance
      • Microsoft Tenant Data Analytics
        • Organization Chart using Microsoft Graph API
      • Process Flow
      • Sales Performance Analysis
      • Cost Center Analysis
      • KPI Tree
      • Warehouse Management
      • Supply Chain Network
    • Configuring the chart structure
      • Hierarchy structure
      • Grouping / Swim Lanes
        • Data Structure for Columnar Group View
        • Data Structure for Wide Group Views
      • Invisible Group
    • 🪪Display Data in the Cards
      • Title, Subtitle
      • 👨‍💼Images
        • Converting HTTPs link images/icons to Base 64 in Power BI
        • Handling long Base 64 URLs in Power BI
      • 🔢Displaying KPIs
        • Number Formatting
      • 🔻Displaying Variance
      • Sparkline Trends
      • 🔗Hyperlinks
    • Card Formatting
      • Data-Driven Color
      • Templates
      • Customize Template
        • Insert additional data
        • Alignment
        • Wrap Text
        • Styling
        • Margin & Split
        • Modify (Delete / Cope-Paste)
        • Import/Export
    • Links
    • 🗒️Notes & Annotation
    • 🚦Conditional Formatting
    • Layout & Orientation
    • ✨Search
    • ✨Viewing Subtrees
      • Cross Filtering with Subtrees
    • 🔐✨User Context - RLS Experience
    • ✨Filter Context
    • 🎨Formatting Features
      • Formatting Font & Colors
      • Connectors
      • Expand Collapse Button
      • Dimensions
    • Toolbar Ribbon Configuration
    • Simulation
    • ❓FAQs
      • Circular Dependency message
    • Tips & Tricks
      • Bookmark
      • Report Page Tooltip
      • Field Parameters
      • Drill Through
    • Release Notes
Powered by GitBook
On this page

Was this helpful?

  1. Project Management
  2. Other Features

Display Totals

PreviousDisplay DurationNextHide Blanks

Last updated 6 months ago

Was this helpful?

Display overall totals in the xViz Gantt Chart.

To show the overall total display in the Gantt chart go to the format pane and then select chart options-> Display totals (toggle on).

We have the flexibility to modify the total display text as per our needs.

Steps to be configure:

To show numeric information on the Gantt, go to format pane and then click display categories.

  1. Select the Duration type you need to display on the visualization as shown below:

  1. Go to the chart options from the format pane and then turn on Display totals option.

And the overall result is displayed on the Gantt chart as shown below.


Try the (Microsoft certified) for Power BI from Microsoft AppSource .

➡️
xViz Gantt Chart
here
GIF 1: Display overall totals in xViz Gantt Chart
Image 1: Data field to configure Display Totals
Image 2: Overall Result in xViz Gantt Chart
Image 3: Data field to configure Totals Text
Image 4: Data Fields to configure Duration Type
Image 5: Resultant view of the Duration Type in xViz Gantt
Image 6: Turn on Display Totals
Image 7: Resultant view of the overall result in xViz Gantt Chart