xViz
ProductPricingCommunity
  • Welcome to xViz Docs!
  • Project Management
    • Project Management - xViz Gantt Chart | Introduction
    • Hierarchy and Additional Columns
    • 🔸Milestones
      • Milestone Formatting
    • Planned Bars
      • Planned Bars Formatting
    • Connectors
      • Primary & Secondary Connectors
      • Multiple Connectors
      • Connectors Formatting
    • Progress
      • Tracking the progress
      • Progress Bar Display
      • Progress Base
      • Bar Formatting
    • Timeline Configurations
      • Timeline Start/End
      • Timeline Range
      • Header Levels
      • Zoom Levels
      • Zoom Options
      • Fiscal Year Support
      • Timeline Format
      • Language Support for Timeline
    • ✨Alerting Techniques
      • Steps to enable Conditional Formatting
      • Conditional Formatting
    • Reference Lines and Reference Range
      • Introduction
      • Static Approach
      • Data Driven Approach
    • Resource Gantt
    • ➡️Other Features
      • Data Colors
        • Row Background Color
        • Bar Border Color
        • Bar Selection Color
        • Bar Fill Color
        • Connectors
      • Duration Data field
      • Display Duration
      • Display Totals
      • Hide Blanks
      • Date Formats
      • DaysOff
        • Weekday
        • Custom Date
      • Setting Up Drill-through
      • Configure External URLs
      • Splitter Position
      • Text Customization
      • Row Numbering
      • Indentation
      • Sorting
    • Parent Level Calculations
      • Aggregation Types
    • Tooltip
    • Release Notes
    • ❓FAQs
  • Performance Management
    • Performance Flow - Introduction
      • Installing from AppSource
      • Get Started
    • Use Cases
      • Organization Performance
      • Microsoft Tenant Data Analytics
        • Organization Chart using Microsoft Graph API
      • Process Flow
      • Sales Performance Analysis
      • Cost Center Analysis
      • KPI Tree
      • Warehouse Management
      • Supply Chain Network
    • Configuring the chart structure
      • Hierarchy structure
      • Grouping / Swim Lanes
        • Data Structure for Columnar Group View
        • Data Structure for Wide Group Views
      • Invisible Group
    • 🪪Display Data in the Cards
      • Title, Subtitle
      • 👨‍💼Images
        • Converting HTTPs link images/icons to Base 64 in Power BI
        • Handling long Base 64 URLs in Power BI
      • 🔢Displaying KPIs
        • Number Formatting
      • 🔻Displaying Variance
      • Sparkline Trends
      • 🔗Hyperlinks
    • Card Formatting
      • Data-Driven Color
      • Templates
      • Customize Template
        • Insert additional data
        • Alignment
        • Wrap Text
        • Styling
        • Margin & Split
        • Modify (Delete / Cope-Paste)
        • Import/Export
    • Links
    • 🗒️Notes & Annotation
    • 🚦Conditional Formatting
    • Layout & Orientation
    • ✨Search
    • ✨Viewing Subtrees
      • Cross Filtering with Subtrees
    • 🔐✨User Context - RLS Experience
    • ✨Filter Context
    • 🎨Formatting Features
      • Formatting Font & Colors
      • Connectors
      • Expand Collapse Button
      • Dimensions
    • Toolbar Ribbon Configuration
    • Simulation
    • ❓FAQs
      • Circular Dependency message
    • Tips & Tricks
      • Bookmark
      • Report Page Tooltip
      • Field Parameters
      • Drill Through
    • Release Notes
Powered by GitBook
On this page

Was this helpful?

  1. Project Management
  2. Timeline Configurations

Timeline Range

PreviousTimeline Start/EndNextHeader Levels

Last updated 5 months ago

Was this helpful?

Use the Zoom Range Options to configure the time range to be visible by default at any point of time on the visualization. End users can navigate across the rest of the timeline with the horizontal scroll.

Enabling the Zoom Range Options gives us the capability to set the Zoom units, Range and Anchor the date as per needs.

Go the Format Pane -> Timeline -> Zoom Range Enable (Toggle On/Off)

  1. Zoom Units: This option defines the unit to be used to define the visible range in the timeline. There are eight options in the Zoom units as seen below:

  1. Zoom Range: This option defines the visible ranges to fit in the timeline while using the buttons or wheels for zooming.

  1. Zoom Anchor: The horizontal scroll is enabled if the Timeline spans beyond the visible range on the chart. With this option, you can define the default position of the scroll. There are six options in Zoom Anchor as seen below:

  1. Scroll Bar Color Option: Set the color of the scroll bar using color palette.

In the below example, the Timeline is set to display 3-day period. The scroll position is set to the first date of the data. And scroll bar color is set to blue

The result can be seen in the image below:

Image 1: Zoom Unit options in xViz Gantt Chart
Image 2: Zoom Range in xViz Gantt Chart
Image 3: Zoom Anchor options in xViz Gantt Chart
Image 4: Zoom Range in xViz Gantt Chart
Image 5: Timeline Zoom Range visualization in the xViz Gantt Chart